115-kV Transmission Line 115-kV Transmission Line
Siem Reap, Cambodia
Asian Development Bank and Cambodia Power Transmission LinesPower/Energy, Transmission & Distribution
14th Street Corridor - The Ambassador 14th Street Corridor - The Ambassador
Denver, Colorado, United States
City and County of Denver, Downtown Denver PartnershipVisualization, Design Visualization
50 Connaught Road Central 50 Connaught Road Central
Hong Kong
Apollo Global Real EstateProgram Management/Construction Management
63rd Street Connector 63rd Street Connector
Queens, New York, United States
Metropolitan Transportation Authority - New York City TransitRail, Tunneling & Geotechnical
796 Huai Hai Road Restoration 796 Huai Hai Road Restoration
Shanghai, China
Richemont GroupBuilding Engineering, Commercial & Retail
AC Transit State of Good Repair AC Transit State of Good Repair
California, United States
Alameda-Contra Costa TransitStrategic Consulting, Asset Management Strategy
Active Traffic Management Feasibility Studies Active Traffic Management Feasibility Studies
Seattle, Washington, United States
Washington State Department of TransportationIntelligent Transportation Systems
African Burial Ground Memorial African Burial Ground Memorial
New York, New York, United States
General Services Administration Government
Air Liquide Hydrogen Storage Cavern Air Liquide Hydrogen Storage Cavern
Spindletop, Texas, United States
Air Liquide Large Industries U.S., LPPower/Energy, Underground Storage, Program Management/Construction Management
Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade project Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade project
Brisbane, Queensland, Australia
Queensland GovernmentTransportation, Highways, Mass Transit, Bus, Mechanical/Electrical, Tunneling & Geotechnical

title

Air Liquide Hydrogen Storage Cavern

Spindletop, Texas, United States

Client: Air Liquide Large Industries U.S., LP

Parsons Brinckerhoff Role: Design, Project Management

Air Liquide Hydrogen Storage Cavern
Parsons Brinckerhoff, the leading designer and constructor of underground hydrocarbon storage caverns and related facilities in the United States, provides design, construction management, and facility operations services to the hydrocarbon storage industry worldwide. Among other projects, the firm is currently working on a hydrogen storage cavern for Air Liquide at the Spindletop Dome near Beaumont in southeast Texas.

The Air Liquide storage cavern will be one of three commercial hydrogen storage caverns in the United States. The cavern is designed to have a working capacity of 3.0 billion cubic feet (85 million cubic meters) of hydrogen. Another 2.0 billion cubic feet (57 million cubic meters) of cushion gas will be required to ensure that the cavern is structurally stable during operations.

Parsons Brinckerhoff prepared feasibility studies and front-end engineering design for the project. The design included thermal modeling of cavern operations to determine final cavern volumes and capacities, using software developed by Parsons Brinckerhoff. The software, originally developed for thermodynamic modeling of natural gas storage caverns, was modified for this project to incorporate the use of hydrogen. The firm also permitted the storage cavern with the Texas Railroad Commission.

Parsons Brinckerhoff recently completed drilling of a 16-inch diameter cavern well, which was completed to a depth of 5,400 feet (1,646 meters) in less than 113 days. The firm is acting as operator and engineer for Air Liquide during solution mining of the cavern. At the end of the solution mining process, Parsons Brinckerhoff will provide project management and engineering services to change the wellhead and well casings to a material that is compatible with hydrogen service, and prepare the cavern for operation. The firm will also provide engineering support during the initial injection of hydrogen into the cavern and subsequent brine withdrawal.