| Table of Contents |

Central Artery Slurry Wall Construction Near South Station |
Introduction (Brenner)
Glossary Special Feature Section:
Slurry Walls
Projects
Cairo Metro Slurry
Walls (Campo, Hudson)
Constructing Slurry
Walls for Baltimore’s Shot Tower Station (Louie)
Groundwater
Considerations for SPTC Walls at Shot Tower Station (Castelli)
The Effects
of Time on Slurry Walls (Merrill)
Using Slurry Walls to Control
Groundwater During Subway Construction (Rice, Flanagan)
Slurry Wall Cutoff
at Santa Cruz Landfill (Abramson, Fowler)
A Case History:
Using Slurry Walls to Control Groundwater (Daugherty)
Vertical
and Horizontal Groundwater Cutoffs Control Drawdowns and Contaminant
Migration (Biswas, Flanagan)
Analysis and Design
Tips for Slurry Wall
Structural Design (Bechara)
Points of View
Should Slurry
Walls be Part of the Final Structure? (Brenner, Gelfer)
Departments
Networking
Vietnam Veterans’
Memorial Crack Mitigation Project: An Update (Bohlke)
Better Business
Through Technology (Cipolloni)
This issue of PB Network is cosponsored by three
Practice Area Networks (PANs):
PAN 10 – Construction Management and Inspection, coordinator
Chris Reseigh
PAN 19 – Geotechnical Engineering, coordinator Phil
Rice
PAN 37 – Tunnel/Underground Engineering, coordinator Lee
Abramson
Thanks to the PAN coordinators and members, and to Robert
Rawnsley of PB’s Boston Office for their article
contributions and help with editing. |
Cover Photos:
Top Left: Slurry Wall Excavation ©CA/T Projects
Graphics Dept.
Second from Top: Guidewalls ©CA/T Projects Graphics
Dept.
Third from Top: Excavating Between
Slurry Walls ©CA/T Projects Graphics Dept.
Bottom Left: Reinforcement Cage ©1996 Louis
Martin
Upper Right: Slurry Wall Excavation ©1996 Louis
Martin
Lower Right: Schematic of CA/T Construction ©David
Macauley |
Technology Transfer
Updates (Flieger)
Computer Tutor
Maintaining a Mail
Merge Mailing List Using Microsoft Word 6.0c (Beebe)
Bulletin Board
Updates: PBDOCS and STS
(Asadi)
Converting 3-D Digital
Terrain Models to Metric (Casolo, Pagano)
In Future Issues
Winter ‘96/97: 10th Anniversary (!) PB Network
Spring ‘97: Water Resources Projects
Still accepting selected articles.
Summer ‘97: Operations and Maintenance Services
Deadline extended to December 20.
Fall ‘97: Research and Development at PB
Deadline: February 21, 1997.
Winter ‘97: New Construction Tools
Deadline: May 1, 1997.
Call for Articles
Editorial Staff
Cover Page |
|