Parsons Brinckerhoff
Worldwide LocationsContact PBLegal NoticeSite MapHome
PB Websites search Advanced Search
MarketsServicesAbout UsPeople and CareersNews and EventsResearch LibraryProjects
PB Network Email This Page
Go To Other Issues | Contact PB Network | Print This Article 
Movable Bridges
July 2000 • Issue No. 47 • Volume XV • Number 2
Table of Contents
From the Editor Time to Restate Our Mission (Chow, Anderson)

Special Feature Section

Introduction: PB History of Movable Bridges (Abrahams)

Perspective: Movable Bridge Engineering Work (Koglin)

PB's Representative Movable Bridge Projects

Glossary

Construction

World's Largest Movable Span: Floating Draw at Pearl Harbor Naval Station (Abrahams)

Replacement of the George P. Coleman Bridge (Abrahams, Castelli)

Green Bay's Main Street Bascule Bridge (The Ray Nitschke Memorial Bridge) (Elwell)

Merseyside's Poulton Swing Bridge (Sansbury)

The Hood Canal Floating Bridge (Abrahams)

Woodrow Wilson Bridge Replacement (Abrahams)

Studies/Evaluations

Hood Canal Bridge: A Study of the West Structure Control System (VanDeRee)

In-Depth Scour Evaluations of Three Movable Bridges (Anella, Krishnagiri, Stanford)

Seismic Assessment of Two Bridges in New York City (Abrahams, Wang)

Mitre Rails for Movable Railway Bridges (Padgett)

Rehabilitation Study of the Arthur Kill Vertical Lift Bridge (Abrahams)

Inspections

Bridge Electrical Inspections (Crouthamel, Newcomb, Patino, VanDeRee)

New Jersey Experience in Movable Bridge Inspection (Krishnagiri, Anella, Lackpour)

Movable Bridge Inspection Safety (Crouthamel, Newcomb, Patino, VanDeRee)

Rehabilitation and Repair

Leading the Way in Applied Technology for Control Systems (Newcomb)

Staged Construction and Traffic Maintenance: A Case Study (Parkinson, Yacobucci)

Repairing Structural Damage to the Tacony-Palmyra Bridge (Veksler)

Saving the East Bridge House of Chicago's Monroe Street Bridge (Grainawi)

South Capitol Street Bridge Rehabilitation in Washington, D.C. (Rosenbaum, Charters)

Mechanical Repairs on the Stone Harbor Bridge (Nyarko)

Other Work in Movable Bridges

Departments

Networking

PB Technotes: Something Doesn't Smell Right: Two-Dimensional Flood Plain Study of Onion Creek (Buechter, Smith)

Better Business Through Technology: Information Technology in the New Millennium: A View Into the Future (Wilk)

COMPUTER TUTOR: Take the Drudgery out of File Labels by Using Microsoft Word "Mail Merge" (Alexander)

THE NET VIEW: A Comparison of Dilbert and Wally (Brenner)

Lessons Learned: Movable Bridges (Parkinson)

In Future Issues

Call for Articles

Editorial Staff

Cover Page

Go To Other Issues | Contact PB Network | Print This Article 
Markets  |  Services  |  About Us  |  People + Careers  |  News + Events  |  Research Library  |  Projects
Worldwide Locations  |  Contact PB  |  Legal Notice  |  Site Map  |  Home
© Parsons Brinckerhoff