| Overview (Chandra)
Introduction (Parkinson)
Glossary
Special Feature Section
Cable-Stayed Bridges:
A Brief History And Overview of Design Elements (Chandra)
Spotlight on Owensboro Bridge
Vital Statistics: An Illustration
Approaches Made Continuous
With Side And Main Spans (Drewery)
Effect Of Barge Impact
Loads On Foundation Design (Drewery, Berry)
Hydraulic Analysis
And Scour (Chandra, Ports)
Structural Analysis
(Hamawi, Hsu)
Superstructure Design Features
(Hsu)
Creative Solution At
Anchor Piers (Hamawi, Wahl)
Tower Design Gets An “A”
(Hsu, Valvezan)
Innovative Cable Anchorages
(Gale, Valvezan)
Bearings (Gale, Hamawi)
Wind Tunnel Tests Verify Our
Design (Hsu)
Construction Sequence
(Wahl)
Quality Control/Quality
Assurance And Constructibility Reviews (Chandra)
Departments
Networking
Pins And Hangers: To Be
Or Not To Be? (Charters, Rosenbaum)
Guide Guided Expansion
Bearings In The Right Direction (Rosenbaum, Dergham)
Update On The Intergraph
CADD Division (Smith)
Metrication: A Few Pointers
(Podwal)
New And Improved Corporate
Identity Templates (Cabrera)
PB’s Document Control
System (Culligan)
Technology Transfer
Bulletin Board
Papers: Tug Fork Floodplain Modifications
And Wetlands Mitigation (Ports, Dee, Riling)
A Database Of PB Structural
Engineering Software
Software Used On The Owensboro
Bridge Design
In Future Issues
Fall ‘94: Project Control
Winter ‘94: Projects in Asia. Deadline August 31, 1994.
Spring ‘95: ISTEA. Deadline November 15, 1994.
Editorial
Staff
Cover Page |