Washington State Ferry Terminal |
Washington State Ferries (WSF) operates the largest ferry vessel
fleet in the U.S. Twenty-five vessels cross the Puget Sound and
its inland waterways continually. Each day, they carry more than
23 million passengers to 20 ports of call from Tacoma, Washington
to Sidney, British Columbia. These ferry routes act as the marine
highway for commercial users, tourists and daily commuters.
WSF wanted to replace the existing manual methods and procedures
that their engineers and managers used to plan, execute, monitor
and record their maintenance activities. A steering committee comprised
of several key staff members from WSF’s vessels, terminals,
Eagle Harbor Repair Facility, and Information Technology Group reviewed
numerous computerized maintenance management system (MMS) software
packages. The committee preferred an off-the-shelf solution as long
as it could integrate the maintenance activities of more than 25
vessels, 20 land-based terminals and the individual maintenance
shops at the Eagle Harbor Maintenance Repair Facility, and allow
management to capture valuable maintenance information easily.
The committee selected the Summit Maintenance Management software
package, developed by Summit Software (formerly ECTA, Corp.), the
same system that we used for the I-90 tunnel for Washington State
Department of Transportation (WSDOT). They also chose to employ
the expertise of the PB/Four Winds Group (FWG) team to integrate
and implement the software. This decision was based primarily on
the team’s success on the I-90 tunnel project.
System Objectives and Requirements
In essence, our task is to implement a MMS that is capable of supporting
the operations and management of the maintenance functions throughout
WSF with reliable, timely and easy-to-use information. The system
must:
- Capture and store information for all WSF organizational units
responsible for the maintenance and repair of vessels and terminals
- Process the full range of maintenance transactions (e.g. work
requisitions) used within WSF
- Inform managers and maintenance staff of preventive maintenance
requirements and activities
- Assist in scheduling preventive maintenance and corrective
repair activities
- Monitor on-hand spare parts and bench stock levels
- Provide historical information for quick reference, analysis,
litigation purposes and future planning
- Interact with other WSF databases (inventory, financial, personnel,
etc.).
- Provide standard and unique reports and inquiries.
The complexity and number of users made it necessary to provide
each of the 25 vessels with a stand alone database that could integrate
with a primary land-based database that is used to control the many
vessel terminals and the Eagle Harbor maintenance shops. Although
the full system inventory/history (all vessels, terminals and Eagle
Harbor maintenance shops) can be accessed on the land-based database,
the staff on each vessel can view only that vessel’s equipment
inventory/history.
The stand-alone vessel databases must:
- Allow the staff of each vessel to closely monitor maintenance
activities of their vessels
- Provide the Port Engineer with details concerning overall fleet
maintenance status (via data transfer communication links).
The land-based database must:
- Allow the Terminal Maintenance Manager to monitor all maintenance
requirements and activities for the terminals
- Provide the Eagle Harbor Maintenance Repair Facility with a
means for managing limited resources to accomplish corrective
and annual lay-up maintenance on the vessel fleet and both corrective
and preventive maintenance activities at the terminals and the
repair facility itself.
One of the most critical requirements is to be able to update
the land-based MMS with maintenance information from the vessels.
To accomplish this, each vessel will use specially adapted data
transfer capabilities that will link the vessel to the shore-based
system electronically. As a result of several meetings between the
WSF Steering Committee, PB and FWG, an understanding of the complex
informational flow requirements helped the team in the development
of the initial working prototype.
To satisfy such a large number of “clients” effectively,
extremely close, coordinated working relationships between the users,
the consultants and the software developers is critical. The complexity
of the project has led to the development of some innovative resolutions
that will necessitate the need for specific software customization.
To this end, Summit Software has been extremely cooperative in meeting
the challenges.
A Phased Approach
The project is divided into four phases. In Phase 1, we formed the
overall requirements of the project and established MMS baseline
information describing information flow, management and staff responsibilities,
etc. We also established a model design approach and criteria to
enable development of various model alternatives. Vessel and terminal
site prototypes were recommended during this phase, as well.
In Phase 2, we provided WSF with a prototype MMS database equipped
with limited data from the prototype sites. This prototype was used
to evaluate the capabilities of the software to satisfy the particular
requirements of the vessels and Eagle Harbor Repair Facility staff.
We also identified unique design requirements that would necessitate
further refinement of the database structure.
The objective of Phase 3 is to develop a fully functioning MMS software
production model, further refine the design requirements addressed
in Phase 2 and build a WSF MMS product engineered as a single supported
application. Some customization will be necessary to support unique
WSF spare parts and preventive maintenance requirements for the
vessels, Eagle Harbor work flow processes and data transfer functions.
We have accepted the challenge of satisfying these special requirements
and are currently working closely with WSF staff to gain a better
understanding of the specific details. This phase will also provide
the resources for bar-code and scanner proof-of-concepts.
Phase 4 will consist of building and incorporating the system modifications,
as well as beginning the actual deployment WSF-wide.
Ongoing Challenges
When faced with the complex interactions of such a diverse group
of clients, it is not uncommon to uncover additional requirements
that must be addressed. Although on the surface some of them may
appear as impenetrable as brick walls, they challenge all of us
to search for unique solutions. The use of a team approach has enabled
us to establish the framework for a WSF MMS product that will virtually
eliminate their current manual maintenance methods and procedures.
As historical records accumulate, a comprehensive picture of their
overall maintenance program will begin to develop. They will be
able to more accurately assess current work methods, track and schedule
scarce resources in a more timely manner, and monitor parts and
materials more efficiently. This information will also provide them
with the latest, “up-to-the-minute” data for inquiring,
reporting and budgeting purposes. For more information, contact
Tom Thompson, PB Seattle at 206-382-5241. |