Parsons Brinckerhoff
Worldwide LocationsContact PBLegal NoticeSite MapHome
PB Websites search Advanced Search
MarketsServicesAbout UsPeople and CareersNews and EventsResearch LibraryProjects
PB Network Email This Page
Go To Other Issues | Contact PB Network | Print This Article 
Projects in Australia and New Zealand
July 2003 • Issue No. 56 • Volume XVIII • Number 2
Table of Contents
Introduction: Integrated Teams Providing Integrated Solutions (White, Wallace)

Perspective: A Strong Commitment to Technical Excellence (Keighery, Le Pla)

Transport

Project Alliancing for Motorways (Wilke, Steele, Rankin)

The Bonville Project: Sustainable Solutions for Gliders and Koalas (Donaldson)

PB Lends Design Expertise to New West Lakes Bus Terminal (Benham)

Passenger Flow Analysis of Sydney’s Town Hall Regional Rail Station (Walker)

Sydney’s Parramatta Rail Link: Moving Forward (McNamara, Hewitt)

Auckland: Putting Operational Priorities into Transit Infrastructure (Turner, Smith)

Power/Energy

Criteria for Identifying Viable Wind Power Market Sites (Hoehne)

The Permitting of Toora Wind Farm (Spink)

Steamfield Manager: Software for Resource Consent Reporting and Long-Term Steamfield Management (Anderson, Hochwimmer)

Electrical Requirements of Geothermal Power Projects (Hunt)

Tokelau Power Project (Lynch)

Reusing Effluent to Supply the Millmerran Power Station (Kent)

The Upgrading of an Existing Coal-fired Power Station (Cotter, Lesneski, Reimann)

Victoria’s Ageing Low-Pressure Gas Mains: Urgent Replacement or Not? (Crockett)

PB Takes Lead Role in Electricity Competition Reform (Seipolt)

Expenditure and Reliability Modelling (Nuttall, Bridge)

Lenders Engineer on Power Projects . . . Tales from the Vault (Masllin)

Water

Web-based Integrated Management Systems (Chapman, Rogers)

Controlling Sydney’s Water Supply and Wastewater Systems: Using Technology for Asset Management and System Operation (Knott, Bartindale, Holman)

Innovative Water Reuse Project in Sydney (Low, Phillips)

Urban Development

PB’s Initiative in Sustainable Development

Review of Environmental Factors for the Redevelopment of the Royal Australian Air Force Base in Williamtown (Horn)

Serious Environmental Challenges Met by Simple Engineering Solutions (Evangelisti)

A Real Solution to a Real Problem (Robertson)

Challenges in Master Planning Processes and Delivering Client Outcomes (Duncan, Doss)

Industry and Mining

Sustainable Remediation of Chlorinated Solvent Impacts at a Major Industrial Facility (Wenig, Adams)

Islington Environmental Remediation Project Sets Precedent (Corbett)

Hydrology of Final Void and Spoil Catchments (Tite)

The Mobility of Arsenic in a Shallow Sandy Aquifer (Throssell)

Departments

Networking: Delivering Quality Services for the Singapore Metro Extension Project (Fullerton, Robinson)

PM Forum: Budgeting and Scheduling the Easy Way (Herbold)

Education in Practice: Externships (Brenner)

Computer Tutor: Microsoft Briefs #4 (Johnson, Hart)

The Net View: The Space Needle (Brenner)

In Future Issues

Call for Articles

Editorial Staff

Cover Page


Please also see PB Notes, February 2003 for additional information about PB's projects in Australia and New Zealand.

Go To Other Issues | Contact PB Network | Print This Article 
Markets  |  Services  |  About Us  |  People + Careers  |  News + Events  |  Research Library  |  Projects
Worldwide Locations  |  Contact PB  |  Legal Notice  |  Site Map  |  Home
© Parsons Brinckerhoff