PB tendered six design-build contracts for the job

Construction of the surface ring beam
From design to operations

PB, in joint venture, performed conceptual engineering, engineering investigations, preliminary design, and program and construction management services for the DTSS. The firm’s early investigative work included on-shore geotechnical explorations to determine conditions along prospective alignments. The project was undertaken in three phases:

  • Phase 1: Conceptual and preliminary design for Singapore's entire wastewater system.
  • Phase 2: Assisting the Government of Singapore in tendering six tunnel design/build contracts that form the North System. PB also prepared the draft tender documents for the design of the link sewers, the new Changi East wastewater treatment plant, and the Changi East Outfall.
  • Phase 3: Program management for the six design/build tunnel contracts.

The project is being conducted within a 10-year timeframe, with a scheduled system completion date of 2008. Tunnel excavation was completed in 2005, followed by completion of PB's contract in June 2006 with the commencement of system start-up testing.

   
Projects
  Featured Projects
  Featured Projects Archive
  Projects of the Year
  Project Directory
   
Contact
  projects@pbworld.com
   
  Email This Page
Markets  |  Services  |  About Us  |  People + Careers  |  News + Events  |  Research Library  |  Projects
Worldwide Locations  |  Contact PB  |  Legal Notice  |  Site Map  |  Home
© Parsons Brinckerhoff